LT5002-1 Blade Eagle
- Enables installation of all three blades without using turning gear
- Gust winds up to 18 m/s
- Duplicate electrical components (two independent systems)
- Duplicate hydraulic pumps and directional valves
- Camera system eases grabbing and ungrabbing sequence
- Interactive user manual on tablet
- Prepared for Liftra Tagline System
- Blade pressure equalization system, minimizing loads onto blade
- DNV approved
Highlights
Installation procedureThe first blade is installed and is then lowered to a -60° angle supported by the yoke. This positions the next blade bearing horizontally opposite, ready to receive blade number two.The turbine is then yawed 180°, and the second blade is installed in horizontal position. The blade is raised to a 30° angle to position the final blade bearing. The turbine is yawed back 180°, after which the third blade is installed.